top of page

2007 Piaggio Avanti II 

SN 1140  N829TX

 

Overview:

Nov 2015 Paint and Interior Refubishments

2016 Nose Gear Overhaul

Recent B inspection and 5 Year Inspection completed in 2018

Asking Price: 1.595M

 

Airframe:

Total Time 7223; Total Landings 5565

 

Engines: PT6A-66B

Left Engine PCE-RW0010

•Time Since New 5,700

•Time till OH due: 1,826

Right Engine PCE-RW0005

•Time Since New 6,764

•Time till OH due: 820

 

Props: (6 yr./3600 hr. TBO)

Propeller #1: c/w Nov 2015; next due for Overhaul Nov 2021

Propeller #2: c/w 2015; next due for Overhaul Nov 2021

 

Avionics: 

Collins Proline 21 – Includes Three 8 x 10 LCD displays

Dual Collins VHF-4000 Comms

Dual Collins NAV-4000/4500 Navs w/Collins DME-4000 DME

Dual Collins TDR-94D Mode S Transponders 406 Mhz ELT

Collins AHC/FDU- 3000 AHRS

Collins FMC-3000 Flight Management System

Collins RTA-852 Color Radar

Collins ALT-4000 Radio Altimeter

L3 Communications Standby Instruments

L3 Communications FA-2100 CVR

L3 Communications Skywatch HP TCAS I

L3 Communications Landmark Class-B TAWS

Is currently RVSM Equipped

 

Exterior:

Nov 2015 Matterhorn White with Gray and Orange stripes

 

Interior:

Nov 2015 7 passenger seating + beltedlavfor 8 passenger seats total. The interior has beautiful modern black leather seating with white outlining stitching details. All of the plating is done in brushed nickel and the upper side walls and headliner are in a fabric that mimics a carbon fiber weave. The wood work was also all completed with all new veneer and finished with a dark Ebony stain with a high gloss finish. 

 

Additional Features:

Freon Cooling System

Single Point Refueling

Engine Fire Extinguishers

Nacelle Oil Access Doors

Increased Gross Weight (12,100lbs. MTOW)

Air Cell ST3100 Flight Phone

KGS SS-50 115 Volt A/C Inverter -Cabin and Cockpit 110vA/C Outlets

Inspection Status:

200 hour inspection: next due 7,276

B inspection: due next @ 7,676

C inspection: due next @ 7,779

D inspection: due next @ 9,579

12 Month: next due April 2019

24 Month: next due March 2019

60 Month: next due February 2023 

Nose Landing Gear: c/w April 2016; due next @ April 2028

Main Landing Gear: August 2019 

bottom of page